Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| plan [2026/02/16 19:48] – epsatisep | plan [2026/02/16 19:52] (current) – epsatisep | ||
|---|---|---|---|
| Line 8: | Line 8: | ||
| | 2026-03-18 | | 2026-03-18 | ||
| | 2026-03-21 | | 2026-03-21 | ||
| - | | 2026-03-26 | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure | | + | | 2026-03-25 | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure | |
| - | | 2026-04-06 | Upload the **Interim Report and Presentation** to the wiki (Deliverables) ((The interim report must contain the the following chapters: Introduction, | + | | 2026-04-12 | Upload the **Interim Report and Presentation** to the wiki (Deliverables) ((The interim report must contain the the following chapters: Introduction, |
| - | | 2026-04-10 | Interim Presentation, | + | | 2026-04-16 | Interim Presentation, |
| - | | 2026-04-15 | Upload **3D model video** to Deliverables | | + | | 2026-04-22 | Upload **3D model video** to Deliverables | |
| | 2026-04-29 | | 2026-04-29 | ||
| | 2026-05-02 | | 2026-05-02 | ||
| - | | 2026-05-14 | Upload **packaging solution** to Deliverables and Report | | + | | 2026-05-13 | Upload **packaging solution** to Deliverables and Report | |
| - | | 2026-05-28 | Upload the results of the **Functional Tests** to the Report | | + | | 2026-05-27 | Upload the results of the **Functional Tests** to the Report | |
| - | | 2026-06-15 | Upload the **Final Report, Presentation, | + | | 2026-06-13 | Upload the **Final Report, Presentation, |
| | 2026-06-18 | | 2026-06-18 | ||
| - | | 2026-06-25 | Update the wiki, report, paper with all suggested corrections | | + | | 2026-06-23 | Update the wiki, report, paper with all suggested corrections | |
| - | | ::: | Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | | + | | ::: | Place in the Shared |
| | ::: | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | | | ::: | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | | ||
| - | | 2026-06-26 | Demonstration of the **operation of the prototype** | | + | | 2026-06-25 | Demonstration of the **operation of the prototype** | |
| | ::: | Hand in the **prototype and user manual** to the client | | | ::: | Hand in the **prototype and user manual** to the client | | ||
| | ::: | Receive the **EPS@ISEP certificate** | | | ::: | Receive the **EPS@ISEP certificate** | | ||
| | ::: | Bring **typical food** from your country | | | ::: | Bring **typical food** from your country | | ||
| </ | </ | ||