| | 2026-02-28 | | 2026-02-28 | ||
| | 2026-03-11 | | 2026-03-11 | ||
| - | | 2026-03-15 | Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (Report) | | + | | 2026-03-18 | Upload the **List of Components and Materials (what & quantity)** to the wiki (Deliverables) | |
| - | | 2026-03-19 | Upload the **List of Components and Materials (what & quantity)** to the wiki (Deliverables) | | + | | 2026-03-21 |
| - | | 2026-03-26 | + | | 2026-03-25 | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure | |
| - | | 2026-04-06 | Upload the **Interim Report and Presentation** to the wiki (Deliverables) ((The interim report must contain the the following chapters: Introduction, | + | | 2026-04-12 | Upload the **Interim Report and Presentation** to the wiki (Deliverables) ((The interim report must contain the the following chapters: Introduction, |
| - | | 2026-04-10 | Interim Presentation, | + | | 2026-04-16 | Interim Presentation, |
| - | | 2026-04-15 | Upload **3D model video** to Deliverables | | + | | 2026-04-22 | Upload **3D model video** to Deliverables | |
| | 2026-04-29 | | 2026-04-29 | ||
| | 2026-05-02 | | 2026-05-02 | ||
| - | | 2026-05-14 | Upload **packaging solution** to Deliverables and Report | | + | | 2026-05-13 | Upload **packaging solution** to Deliverables and Report | |
| - | | 2026-05-28 | Upload the results of the **Functional Tests** to the Report | | + | | 2026-05-27 | Upload the results of the **Functional Tests** to the Report | |
| - | | 2026-06-15 | Upload the **Final Report, Presentation, | + | | 2026-06-13 | Upload the **Final Report, Presentation, |
| | 2026-06-18 | | 2026-06-18 | ||
| - | | 2026-06-25 | Update the wiki, report, paper with all suggested corrections | | + | | 2026-06-23 | Update the wiki, report, paper with all suggested corrections | |
| - | | ::: | Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | | + | | ::: | Place in the Shared |
| | ::: | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | | | ::: | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | | ||
| - | | 2026-06-26 | Demonstration of the **operation of the prototype** | | + | | 2026-06-25 | Demonstration of the **operation of the prototype** | |
| | ::: | Hand in the **prototype and user manual** to the client | | | ::: | Hand in the **prototype and user manual** to the client | | ||
| | ::: | Receive the **EPS@ISEP certificate** | | | ::: | Receive the **EPS@ISEP certificate** | | ||
| | ::: | Bring **typical food** from your country | | | ::: | Bring **typical food** from your country | | ||
| </ | </ | ||