| Both sides previous revision Previous revision Next revision | Previous revision |
| plan [2025/02/13 17:50] – epsatisep | plan [2025/05/05 20:16] (current) – epsatisep |
|---|
| ^ Date ^ Description ^ | ^ Date ^ Description ^ |
| | 2025-03-01 | Choose and share your top-3 preferred project proposals via email to [epsatisep@gmail.com](mailto:epsatisep@gmail.com) | | | 2025-03-01 | Choose and share your top-3 preferred project proposals via email to [epsatisep@gmail.com](mailto:epsatisep@gmail.com) | |
| | 2025-03-15 | Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (Report) | | |
| | 2025-03-12 | Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki (Deliverables) | | | 2025-03-12 | Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki (Deliverables) | |
| | | 2025-03-15 | Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (Report) | |
| | 2025-03-19 | Upload the **List of Components and Materials (what & quantity)** to the wiki (Deliverables) | | | 2025-03-19 | Upload the **List of Components and Materials (what & quantity)** to the wiki (Deliverables) | |
| | 2025-03-26 | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure | | | 2025-03-26 | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure | |
| | ::: | Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | | | ::: | Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | |
| | ::: | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | | | ::: | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | |
| | 2025-06-26 | Hand in the **prototype and user manual** to the client | | | 2025-06-26 | Demonstration of the **operation of the prototype** | |
| | | ::: | Hand in the **prototype and user manual** to the client | |
| | ::: | Receive the **EPS@ISEP certificate** | | | ::: | Receive the **EPS@ISEP certificate** | |
| | ::: | Bring **typical food** from your country | | | ::: | Bring **typical food** from your country | |
| </WRAP> | </WRAP> |