plan

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
plan [2025/02/13 17:50] epsatisepplan [2025/05/05 20:16] (current) epsatisep
Line 1: Line 1:
 ====== Milestones ====== ====== Milestones ======
  
-<WRAP round box 800px>+<WRAP round box>
 |< 100% 90px >| |< 100% 90px >|
 ^  Date  ^ Description ^ ^  Date  ^ Description ^
 |  2025-03-01  | Choose and share your top-3 preferred project proposals via email to [epsatisep@gmail.com](mailto:epsatisep@gmail.com) | |  2025-03-01  | Choose and share your top-3 preferred project proposals via email to [epsatisep@gmail.com](mailto:epsatisep@gmail.com) |
-|  2025-03-15  | Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (Report) | 
 |  2025-03-12  | Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki (Deliverables) | |  2025-03-12  | Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki (Deliverables) |
 +|  2025-03-15  | Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (Report) |
 |  2025-03-19  | Upload the **List of Components and Materials (what & quantity)** to the wiki (Deliverables) | |  2025-03-19  | Upload the **List of Components and Materials (what & quantity)** to the wiki (Deliverables) |
 |  2025-03-26  | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure | |  2025-03-26  | Upload the detailed **System Schematics & Structural Drawings** to the wiki (Deliverables) and do the **cardboard scale model** of the structure |
Line 21: Line 21:
 |  :::         | Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** | |  :::         | Place in the files section of the MS Teams channel of your team a **folder with the refined deliverables (source + PDF) together with all code and drawings produced** |
 |  :::         | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** | |  :::         | Hand in to the EPS coordinator a **printed copy of the poster, brochure and leaflet** |
-|  2025-06-26  | Hand in the **prototype and user manual** to the client |+|  2025-06-26  | Demonstration of the **operation of the prototype** |  
 +|  :::         | Hand in the **prototype and user manual** to the client |
 |  :::         | Receive the **EPS@ISEP certificate** | |  :::         | Receive the **EPS@ISEP certificate** |
 |  :::         | Bring **typical food** from your country | |  :::         | Bring **typical food** from your country |
 </WRAP> </WRAP>
  • plan.1739469028.txt.gz
  • Last modified: 2025/02/13 17:50
  • by epsatisep